Make every kilowatt count with heat reuse for data centers

By reusing excess heat, data centers can lower operating costs, cut emissions, and contribute to grid stability.

Heat reuse transforms what was once wasted energy into value. With the right equipment, data centers can:

  • Higher ERF (Energy Reuse Factor), lower PUE (Power Usage Effectiveness), and CUE (Carbon Usage Effectiveness)
  • Offset local heating demand for nearby facilities
  • Support grid stability by reducing peak loads
  • Reduce environmental impact
reuse heat from data center for cities

Proven approaches to heat recovery

Not all heat reuse strategies are the same. The right approach depends on data center design, climate, and heating demand.

Indirect heat recovery

Heat is transferred from the data center’s cooling loop to an external network, such as district heating, through a heat exchanger. This method is straightforward and effective when there is consistent demand for heating nearby.

  • Transfers excess heat directly to local heating systems
  • Lower system complexity, fewer moving parts
  • Best for sites near district heating infrastructure

Waste heat from Odense data center to warm local community

The leading social media giant aims to minimize the energy, emissions, and water impact, embracing the responsibility and opportunity to impact the world beyond their operations.

Read more

Waste heat from Odense data center

Ready to redefine your data center cooling strategy?

Stop wasting energy and start reusing it. With Alfa Laval’s advanced heat recovery solutions, your data center can unlock cost savings and reduce emissions. Talk to our experts today and unlock the full potential of heat reuse.


Speak to a data center expert

FAQs

When is data center heat reuse commercially practical?

It is more practical when a nearby user needs heat at compatible temperatures. Distance and year-round demand affect project value.

How does indirect heat recovery protect the cooling circuit?

A heat exchanger transfers energy to the external heating network while keeping the data center cooling fluid separate.

When is a heat pump relevant to data center heat reuse?

A heat pump is relevant when recovered heat is below the user's required delivery temperature. Its electricity demand belongs in the business case.

What should be assessed before connecting to district heating?

Assess network proximity, temperature requirements, demand patterns and connection costs. Define how cooling continues when the heating network accepts less heat.

Does heat reuse replace the need for backup heat rejection?

Not automatically. The cooling design needs a reliable rejection route when external heat demand falls or the reuse system is unavailable.

How should heat reuse benefits be measured?

Track useful heat delivered and the electricity needed to recover it. Assess displaced heating energy alongside data center operating performance.

Why does seasonal heating demand matter for project economics?

Demand often falls during warmer months. Annual useful heat delivery matters more than theoretical heat availability alone.

Which temperatures are needed for a heat recovery assessment?

Provide cooling loop supply and return temperatures plus the heat user's requirements. Include flow rates and expected operating hours.

What should operators discuss before investing in heat reuse?

Discuss demand reliability, temperature matching, ownership and operating costs. Define the cooling fallback arrangement before committing to the reuse system.